Malešice Apartments – Phase II

Location

Prague

Investor

SIDI PRAGUE, s.r.o. (B. Yair Group)

Construction period

10/2013 – 10/2015

Type of construction

Residential

Scope of services

Construction

  • Ecosite is an environmental quality label awarded to construction sites of the Bouygues Construction Group. It declares the compliance with the established environmental policy, which aims to reduce the environmental impacts of building construction.
  • Green Site Office is a tool of the Bouygues Construction Group aimed to mitigate the environmental impacts of the site installation on the construction locality, e.g. by reducing water and electricity consumption, using efficient cooling and heating, waste prevention and sorting, or raising awareness of environmental issues.
Malešice’s new natural city center has brought a pleasant refreshing to this Prague neighborhood.

The housing complex’s second phase completes construction on Malešice’s new city center. The building has a shared basement with two underground floors, which include 401 parking spaces, an area for washing vehicles, and technical facilities – as well as 5 independent above-ground buildings with 8, 15, and 18 floors, respectively. There are 16 commercial properties located on the ground floor, including a supermarket and a wellness center. The other above-ground floors hold 71 studios and 210 apartments.

The building’s foundation was designed using a slab located on piles. The building’s waterproofing system uses watertight reinforced concrete construction concept (white tank). The load-bearing vertical and horizontal construction is executed using monolithic reinforced concrete. Brick or foam concrete blocks are used for the exterior perimeter walls and interior dividing walls. The roofs have been designed to be green; they include extensive green roofs as well ones supporting and not supporting foot traffic. The building’s cladding is comprised of a combination of an exterior insulation system and a ventilated facade; the ground floor is supplemented by a facade of glazed aluminum. The work included completing construction on a ground floor space between the buildings in Phases I and II, including park modification and connecting routes.

Job vacancies

Currently, we have several new projects in the pipeline, which open up new career opportunities in our company. Would you like to join our team?

Feel free to contact us!

More in Career

Contact information

VCES a.s. - Head office
Harfa Office Park
Českomoravská 2420/15
190 00 Praha 9

Warning: Fake purchase orders are circulating under the names of Bouygues Construction and the group’s subsidiaries! Fraud attempts using fake purchase orders are on the increase. Protect yourself by carrying out the following checks as a matter of habit:

  • Always pay attention to checking the factual accuracy of the order/document.
  • Check that your contact e-mail address ends with @vces.cz
  • If in doubt, or if you receive a fake e-mail, be sure to get in touch with your usual VCES contact or use the contact form available on this website.

Číst více