Datwyler Sealing Technologies CZ – New Factory Buildings
Nový Bydžov
InvestorDatwyler Sealing Technologies CZ s.r.o.
Construction period02/2016 – 12/2017
Type of constructionIndustrial
Scope of servicesConstruction, Manufacture and assembly of precast concrete structure
- Green Site Office is a tool of the Bouygues Construction Group aimed to mitigate the environmental impacts of the site installation on the construction locality, e.g. by reducing water and electricity consumption, using efficient cooling and heating, waste prevention and sorting, or raising awareness of environmental issues.
Datwyler has increased its production capacity for sealing components.
The manufacturing facility was expanded to include two new production buildings, No. 5 and No. 6, with technical facilities and laboratories. A new parking lot, an access road, and other routes have also been built – as well as gas and water mains and a sewer system.
The project’s execution required a comprehensive solution for coordinating the construction with simultaneously ongoing production. Factory No. 5 is a 3-bay building with dimensions of 42 x 76 m and it was built first, and after production was moved, part of the existing factory No. 3 was demolished and factory No. 6 was completed – 1-bay building with built-in floor and total built-up area of 24 x 42 m.
The factories are three- and two-floor buildings with foundations that use reinforced concrete piles with a foundation slab, under which soil stabilization was conducted. The load-bearing construction is built using precast reinforced concrete elements. The roof is made from trapezoidal sheeting with a PVC roofing membrane and mineral wool (Combi Roof). The buildings are clad in horizontal sandwich panels (with a mineral wool core). The factory is equipped with a 20 cm thick reinforced concrete floor.
In numbers
- 2 factory buildings
- 6 778 m2 of usable floor area
- 64 832 m3 of building volume