Hospital in Svitavy

Location

Svitavy

Investor

Hospital in Svitavy

Construction period

10/2001 – 01/2005

Type of construction

Health care

Scope of services

Construction

The acute medicine building in the Hospital in Svitavy includes basic operations and complementary services; primarily operating rooms and central sterilization, intensive care units, an anesthesiology and resuscitation department, casualty wards, and treatment rooms, clinical biology ward – labs. Last but not least, the main hall of the building also serves as an entrance area for the entire hospital. On all floors, the building is connected with inpatient wards and with the emergency unit. The hospital complex is rather cramped and the building is therefore designed as a monoblock.

The structure is formed by a monolithic skeleton and brick outer shell. The building is based on stilt foundations. Air in most of the premises is ventilated with the help of air-handling technology which ensures the required purity level. The operating rooms are designed as metal cells built in the skeleton.

Job vacancies

Currently, we have several new projects in the pipeline, which open up new career opportunities in our company. Would you like to join our team?

Feel free to contact us!

More in Career

Contact information

VCES a.s. - Head office
Harfa Office Park
Českomoravská 2420/15
190 00 Praha 9

Warning: Fake purchase orders are circulating under the names of Bouygues Construction and the group’s subsidiaries! Fraud attempts using fake purchase orders are on the increase. Protect yourself by carrying out the following checks as a matter of habit:

  • Always pay attention to checking the factual accuracy of the order/document.
  • Check that your contact e-mail address ends with @vces.cz
  • If in doubt, or if you receive a fake e-mail, be sure to get in touch with your usual VCES contact or use the contact form available on this website.

Číst více